Beyond Typicals

Beyond Typicals is the refreshingly simple, shockingly powerful typical section creator for urban planners, roadway designers, public officials, contractors, civil engineers, project managers, local advocates and more.

Learn more and receive a Subscription ID for a free 30-day trial at www.beyondcad.com/beyondtypicals (Opens in new tab). No credit card required.
Subscribe to continue creating watermark-free images and videos after your trial.

Use this intuitive, drag-and-drop creator for real-time planning, project coordination, public meetings, proposals, draft concepts, 3D typical sections, safety visualization, maintenance of traffic (MOT) planning, and much more.

Features Include

  • Photorealistic Assets
  • Custom Section Creator
  • Streetmix Importer
  • Advanced Traffic
  • Customizable Striping & Pavement Markings
  • Advanced Texturing
  • Copy & Paste Asset Groups
  • Hierarchy Organization
  • Phasing & Alternatives
  • Underground Utilities
  • Walls, Elevation, Constant Slope Sections
  • Bridge Creation
  • Image & Video Rendering
  • Photo Compositing
  • Visual Graphics
  • Enhanced Layout Mode
  • Expanded Scene Effects
  • 3D or 2D Editor & Rendering
  • Sky, Lighting, & Background Controls
  • Customizable Labels
  • Imperial & Metric Units
  • Left & Right Hand Traffic
  • Performance Settings

Create Visualization Graphics For

  • PowerPoint Presentations
  • Websites
  • Public Meetings
  • Brochures
  • Social Media
  • News Broadcasts
  • Newsletters
  • YouTube Videos
  • Large Prints
  • Mailed Flyers

Roads, Streets and More

  • Complete Streets
  • Pedestrian Improvements
  • Freeway Widening
  • Downtown Projects
  • Rural Highways
  • Bike Path Design
  • Pedestrianization
  • Corridor Redesign
  • Safety Planning
  • Design-Build
  • Alternative Analysis
  • Bridge Concepts
  • Construction Phasing and MOT Planning

Quick Facts

  • Standalone Windows PC application built on Unreal Engine
  • Developed by Beyond CAD Inc., an Epic MegaGrants recipient
  • Available with monthly or annual subscriptions
  • Individual and floating enterprise licensing options
  • Software updates included with an active subscription

Version 4.0

Beyond Typicals 4 introduces new ways to create and customize your projects, including the Custom Section Creator, Streetmix importing, expanded asset libraries, advanced traffic distribution, improved texturing, and more flexible bridge and layout tools.

Existing subscribers can activate Version 4 using their current Subscription ID.

Files opened and saved in Version 4 cannot be reopened in earlier versions of Beyond Typicals. Keep a separate copy of older projects before saving them in Version 4.

App
May include in-app purchases
Free
DeveloperBeyond CAD
Publisher
Beyond CAD
Release Date
Platform

Follow Us

External Links

Beyond Typicals System Requirements

Minimum

OS version

Windows 10 64 bit

CPU

Quad-core Intel or AMD, 2.5 GHz or faster

Memory

4 GB RAM

Storage

6 GB

DirectX

DirectX 11

Recommended

OS version

Windows 10 64 bit

CPU

Octa-core Intel or AMD, 3.0 GHz or faster

Memory

8 GB RAM

Storage

10 GB

Languages Supported

Audio:
  • English
Text:
  • English

See EULA at www.beyondcad.com/eula

Privacy Policy (Opens in new tab)
* The lowest price offered on The Epic Games Store in the last 30 days before discount