Teenage Mutant Ninja Turtles: Splintered Fate

4.6
  • Great Boss Battles
  • Diverse Characters

Unleash the Turtles in a rogue-like quest to rescue Splinter from the Foot Clan! Master ninja skills, unite in bodacious co-op gameplay, and conquer iconic NYC locales.

Teenage Mutant Ninja Turtles: Splintered Fate-1orjn

Grab your friends, pick your favorite Turtle and jump into an adventure to save Master Splinter from the Foot Clan! Master ninja skills, unite in bodacious online and local co-op gameplay, and conquer iconic NYC locales.

Looking for a more immediate, high-intensity challenge? Dive into the brand-new Arcade Mode packed with unpredictable runs, the Hex and Flex system, new biomes, fearsome Wraith enemies, and even more chaotic fun with friends.

Teenage Mutant Ninja Turtles: Splintered Fate-sjecl

Teenage Mutant Ninja Turtles: Splintered Fate-1lq30

Brace yourself for fast-paced, roguelike action where no two runs are the same. With randomized power-ups, room layouts, and boss modifiers, the excitement never ends. Take control of all four Turtles, each wielding unique powers, and team up with friends for bodacious co-op gameplay. Explore iconic NYC locations, upgrade your Turtle powers, and prepare to face off against formidable enemies.

Teenage Mutant Ninja Turtles: Splintered Fate-1tut6

Teenage Mutant Ninja Turtles: Splintered Fate-1uo9o

Master the powers of water and fire, utrom and ooze, light and darkness, robotics and -most importantly- Ninja to create unique and bodacious builds for your Turtles. Every run brings new challenges and opportunities - explore and perfect your favorite builds, and combine them with allies to conquer your enemies.

Teenage Mutant Ninja Turtles: Splintered Fate-atlw9

Teenage Mutant Ninja Turtles: Splintered Fate-to42u

When Splinter is kidnapped by Shredder, mysterious portals appear across NYC and the Turtles will battle to recover their father from the clutches of the Foot Clan. However, an even greater threat lingers in the shadows…

Teenage Mutant Ninja Turtles: Splintered Fate-r45ab

With additional settings, balance and tuning enhancements for PC, Splintered Fate promises to keep you engaged in the FIGHT, ADAPT, REPEAT portal loop. Be ready to restore peace to the city!

ESRB Everyone 10+
Everyone 10+
  • Fantasy Violence
  • Mild Language
  • Users Interact
Base Game
$29.99
Epic RewardsEarn 5% back
Refund TypeSelf-Refundable
DeveloperSuper Evil Megacorp
Publisher
Super Evil Megacorp
Release Date
Platform
See All Editions and Add-Ons

Teenage Mutant Ninja Turtles: Splintered Fate Editions (4)

  • Teenage Mutant Ninja Turtles: Splintered Fate

    ESRB Everyone 10+
    Everyone 10+
    • Fantasy Violence
    • Mild Language
    • Users Interact
    • Teenage Mutant Ninja Turtles: Splintered Fate
    • Teenage Mutant Ninja Turtles: Splintered Fate Soundtrack
    • TMNT: Splintered Fate Casey Jones & the Junkyard Jam
    • TMNT: Splintered Fate - Samurai Armor
    • Teenage Mutant Ninja Turtles: Splintered Fate Digital Artbook
    • TMNT: Splintered Fate - Alopex Character DLC
    • TMNT: Splintered Fate - Metalhead Character DLC
    • TMNT: Splintered Fate - Slash Character DLC
  • TMNT: Splintered Fate - Gold Edition

    ESRB Everyone 10+
    Everyone 10+
    • Fantasy Violence
    • Mild Language
    • Users Interact
    • Teenage Mutant Ninja Turtles: Splintered Fate
    • Teenage Mutant Ninja Turtles: Splintered Fate Soundtrack
    • TMNT: Splintered Fate Casey Jones & the Junkyard Jam
    • TMNT: Splintered Fate - Samurai Armor
    • Teenage Mutant Ninja Turtles: Splintered Fate Digital Artbook
    • TMNT: Splintered Fate - Alopex Character DLC
    • TMNT: Splintered Fate - Metalhead Character DLC
    • TMNT: Splintered Fate - Slash Character DLC
  • TMNT: Splintered Fate - Platinum Edition

    ESRB Everyone 10+
    Everyone 10+
    • Fantasy Violence
    • Mild Language
    • Users Interact
    • Teenage Mutant Ninja Turtles: Splintered Fate
    • Teenage Mutant Ninja Turtles: Splintered Fate Soundtrack
    • TMNT: Splintered Fate Casey Jones & the Junkyard Jam
    • TMNT: Splintered Fate - Samurai Armor
    • Teenage Mutant Ninja Turtles: Splintered Fate Digital Artbook
    • TMNT: Splintered Fate - Alopex Character DLC
    • TMNT: Splintered Fate - Metalhead Character DLC
    • TMNT: Splintered Fate - Slash Character DLC
  • TMNT: Splintered Fate - Platinum Cowabunga Edition

    ESRB Everyone 10+
    Everyone 10+
    • Fantasy Violence
    • Mild Language
    • Users Interact
    • Teenage Mutant Ninja Turtles: Splintered Fate
    • Teenage Mutant Ninja Turtles: Splintered Fate Soundtrack
    • TMNT: Splintered Fate Casey Jones & the Junkyard Jam
    • TMNT: Splintered Fate - Samurai Armor
    • Teenage Mutant Ninja Turtles: Splintered Fate Digital Artbook
    • TMNT: Splintered Fate - Alopex Character DLC
    • TMNT: Splintered Fate - Metalhead Character DLC
    • TMNT: Splintered Fate - Slash Character DLC

Teenage Mutant Ninja Turtles: Splintered Fate DLC & Add-Ons

TMNT: Splintered Fate - Slash Character DLC

Add Slash to the lineup– he’s big, he’s powerful, and he…loves candy? Use his claw and sheer strength to take down anyone in the way. Play with 5 new Artifacts while stomping through enemies with this latest playable character in TMNT: Splintered Fate.

$3.99
TMNT: Splintered Fate - Alopex Character DLC

Alopex wields her kama with deadly accuracy and speed while facing her troubled past as Karai's sister-in-arms. Explore 5 new Artifacts while playing through a brand new story line as the mysterious mutant arctic fox.

$3.99
See more

Follow Us

Epic Player Ratings

Captured from players in the Epic Games ecosystem.

4.6

Great Boss Battles

This game has

Great Boss Battles
Diverse Characters

This game has

Diverse Characters
Amazing Storytelling

This game has

Amazing Storytelling
Great for Beginners

This game is

Great for Beginners
Playful Visuals

This game has

Playful Visuals
Relaxing

This game is

Relaxing

Teenage Mutant Ninja Turtles: Splintered Fate Ratings & Reviews

54%
Critics Recommend
75
Top Critic Average
Strong
OpenCritic Rating
See All Reviews (Opens in new tab)

COGconnected

by James Paley

80 / 100

“I’ve played a lot of Ninja Turtles games recently. Though I’ve got a strong nostalgic connection to the franchise, the games don’t usually hook me. This one was a little different. The mechanics, along with the smooth challenge build-up and robust progression systems, snagged me immediately. I bounced off the story pretty hard, but I kept coming back anyway. You just want one more run, until it’s something like one in the morning. Between that and the multiplayer, TMNT: Splintered Fate is a worthy addition to an exclusive list of roguelike gems.”

Read Full Review (Opens in new tab)

TheGamer

by George Foster

“Teenage Mutant Ninja Turtles: Splintered Fate might not manage to reach the same heights as the game it so clearly takes inspiration from, but ‘being as good as Hades’ is perhaps an unrealistic goal for any game and it's a wonder that it comes even close. It still provides a satisfying roguelite experience with one of the best interpretations of the TMNT universe I’ve seen in some time. It won’t be replacing Shredder’s Revenge as the franchise’s best modern game, but it’s sitting nicely in second place.”

Read Full Review (Opens in new tab)

Shacknews

by Lucas White

8 / 10

“It may be easy, at a glance, to look at Teenage Mutant Ninja Turtles: Splintered Fate and dismiss it as “we have Hades at home.” There’s a nugget of truth there, as we are looking at an action roguelike clearly inspired by Hades, with a smaller scale in many ways. But does Hades have co-op, or the TMNT? Nah, dudes. Splintered Fate has a specific goal, and it definitely delivers on that goal. It’s a fun time, with a lot of structural solidity and the fun co-op gaming vibes you should expect from a TMNT game. It doesn’t feel cheap or sloppy at all, and even singleplayer can keep your attention for several runs over dozens of hours. I’m still working on it despite winning several loops already, and spinning around like a maniac with my boy Mikey still doesn’t feel old yet.”

Read Full Review (Opens in new tab)
Reviews provided by OpenCritic

Teenage Mutant Ninja Turtles: Splintered Fate System Requirements

Minimum

OS version

Windows 10 64-bit

CPU

Dual Core 2.4 GHz

Memory

4 GB RAM

GPU

1GB VRAM

DirectX

DirectX 10

Storage

5GB

Recommended

OS version

Windows 10 64-bit

CPU

Dual Core 3.0 GHz+

Memory

8 GB RAM

GPU

2GB VRAM

DirectX

DirectX 10

Storage

5GB - SSD

Login Accounts Required

Epic ID

Languages Supported

Audio:
  • English
Text:
  • Arabic
  • Chinese (Simplified)
  • Chinese (Traditional)
  • Dutch
  • English
  • French
  • German
  • Italian
  • Japanese
  • Korean
  • Portuguese (Brazil)
  • Russian
  • Spanish (Latin America)
  • Spanish (Spain)
  • Turkish

© 2025 Viacom Overseas Holdings C.V. All Rights Reserved. Developed and published by Super Evil Megacorp.

* The lowest price offered on The Epic Games Store in the last 30 days before discount